Airports

A Digital Twin for Schiphol Airport

Schiphol Airport is one of the most important airports in Europe. With the change to more sustainable energy generation, they discovered the need to optimise their entire HVAC system. Together with Schiphol Airport and our partner DWA, we illustrate in this webinar how to make the right investment decisions.

A Digital Twin for Schiphol Airport
January 21, 2025

A need to optimise their entire HVAC system

Schiphol Airport is one of the most important airports in Europe. With the change to more sustainable energy generation through heat and cold storage in the ground, as well as heat pumps, they discovered the need to optimise their entire system.

“We wanted good insight into the functioning of the installation. There were times when the flows were not getting where we thought they should and complaints arose. We saw an imbalance in power generation and distribution and sharing, and we really wanted to get our finger on that,” says Andrew van Weers of Schiphol Airport.

375 tons of carbon savings per year

Hysopt's Digital Twin simulations make it possible to understand the performance of an HVAC system. Making the right choices for optimisation has never been easier. Schiphol Airport applied this for Terminal 3. Using Hysopt's Digital Twin, they gained insight into their cooling system and discovered various bottlenecks that would cause comfort problems (over time). The result? An 88% pump energy savings in the installation while maintaining comfort. On an annual basis, this means a cost reduction of approximately 82,000€, and an additional CO2 savings of 375 tons per year!

A Digital Twin for Schiphol Airport

Explore more

image project use case KU Leuven
Education

KU Leuven for Leuven Climate Neutral 2030

The KU Leuven is the largest university in the country, with faculties in 11 different locations. Together they accommodate around 60,000 students all over Flanders.
image project use case vub
Education

VUB

The Vrije Universiteit Brussel has three main campuses, Etterbeek, Jette and Gooik and various other buildings spread across the capital. All hydraulic systems in these buildings needed optimising, which is where Hysopt came into play.
image project use case UA
Education

University of Antwerp

The University of Antwerp has 20,000 students, manages 88 buildings covering 350,000m2 floor space in total, and is planning to add a further 15,000m2 floor space for high-tech laboratories in the near future.