/
/
/
City of Brussels
City of Brussels

City of Brussels

The City of Brussels technical services department is responsible for managing HVAC installations in around 300 buildings in the city.

Balancing existing installations

The City of Brussels technical services department is responsible for managing HVAC installations in around 300 buildings in the city. Joris De Leeuw, head of the special technology department at the City of Brussels: “Of course we want to save as much energy and offer users as much comfort as possible. Hysopt helps us improve existing hydraulics in buildings by rebalancing them and greatly reducing gas consumption.”

Large installation simulations

“We can simulate the behaviour of installations to find out which components need to be replaced, or where adjustments to the pipes network are required. We can see how the installation performs in terms of comfort and energy consumption, which we couldn’t do before,” concludes Joris De Leeuw.

More case studies

Van Marcke

Case study

Van Marcke
Van Marcke is an international wholesaler specialising in kitchens, heating and sanitary installations.
UZA

Case study

Antwerp University Hospital
Antwerp University Hospital (UZA) has 573 beds, employs 3,500 people, and provides more than 500,000 consultations and treatments every year.
AZ Sint-Maarten

Case study

Hospital AZ Sint-Maarten
AZ Sint-Maarten is a general hospital currently spread over three separate campuses, which is relocating to a single large site.