The Antwerp Hospital Network (ZNA) has been building a new central hospital in Antwerp since mid-2016, which will become a ‘new reference in the city’. VK Studio and architectural firm Robbrecht & Daem were responsible for the design. Hysopt is responsible for designing and optimising the HVAC systems, Cegelec for the installation of it. ZNA Cadix Hospital must be ready in 2020.

The Belgian trade journal Installatie en Bouw devoted a wonderful article to it.